We recently delivered, and erected, a Mantis 35.10 and Potain IGO50 to a client based in Mauritius. One of our team of Crane Engineers attended the delivery site to instruct the client on how to erect the Self Erecting Tower Cranes and complete an induction with the Crane Operators on site.

Cranes Sold to Client in Mauritius Gallery

[ngg_images source=”galleries” container_ids=”23″ display_type=”photocrati-nextgen_basic_imagebrowser” ajax_pagination=”0″ order_by=”sortorder” order_direction=”ASC” returns=”included” maximum_entity_count=”500″]

The client is a local provider of construction equipment who supplies the crane to local developer for construction of houses and larger property estate developments. 

The Mantis 35.10 is our flagship crane. It provides a 35m jib with a 21.7m height under hook at the jib end. It can allow our client a jib end capacity lift of 1,000kg and 4,000kg from the tower out as far as 12.05m on the jib. 

The crane was manufactured at our plant in Co. Donegal, Ireland. At this site we also manufacture the Mantis TC25 and Mantis 35.10 PLUS. It is also here that we complete the refurbishment of cranes for our customers. 

Mantis Crane Sales Ireland

Crane Sales FAQ

 

 

Share This Article, Choose Your Platform!

continue reading

Related Posts

  • 3.9 min read

    In 1999 when Mantis Cranes introduced the first self erecting crane to the Irish market, the Ma-sol 18 06 had a maximum lifting capacity of 1,500 kg. Fast forward to 2024 and the self erectors in the Mantis Cranes range now lift loads up to 6 T, with tower cranes lifting up to 24 T. Advancements in crane capabilities in response to changing customer requirements have resulted in a very different landscape for the crane hire industry.

  • 2.5 min read

    Adhering to deadlines is crucial on construction sites and crane downtime can lead to a myriad of problems for contractors. Cutting crane downtime is the key to achieving deadlines. Deadlines range from permit & regulatory deadlines, material delivery deadlines, subcontractor deadlines, and budgetary deadlines to the final project completion deadline. Minimising crane downtime is pivotal to the overall success of a construction project.

  • 2.4 min read

    When restoring historic buildings, care must be taken to preserve these buildings for future generations. Cranes play a crucial role in this process and provide the necessary means of material handling, access, precision, and safety required to carry out restorations without causing additional damage. Over the years, Mantis Cranes have been involved in a number of iconic projects in some recognisable places that involved considerable planning not just to put the crane in place but also for the daily management of materials handling.