Two Self Erecting Tower Cranes in Grimsby

Two of our Potain Self Erecting Tower Cranes are currently working side-by-side on a construction project in Grimsby.

The Pedestrian Operated Tower Cranes, a Potain IGO50 and Potain HUP 40-30, are due to be on site for over four months, working on the project which involves the construction of 124 flats, 96 student rooms with associated communal spaces and a central support hub, with associated landscaping, access and parking works at the Diana Princess of Wales Hospital on Scartho Road in Grimsby.

Two Self Erecting Tower Cranes in Grimsby

 

We added the Potain 40-30 Self Erecting Tower Cranes to our fleet in September 2017 and they have been in high demand since then.

Both cranes offer unique advantages including, but not limited to, increased efficiency and lower costs. The Potain HUP 40-30 has a 40m jib and will provide a maximum capacity lift of 4,000kg out as far as 13.2m and 1,000kg at the end of the jib. It has a height under hook of 30m.

The Potain IGO50 also comes with a 40m jib and will provide a maximum load of 4,000kg out as far as 13m, 1,000kg at the end of the jib. It has an available height under hook of 23.2m.

Recent Mantis Cranes Projects

 

 

 

 

 

Share This Article, Choose Your Platform!

continue reading

Related Posts

  • 3.9 min read

    In 1999 when Mantis Cranes introduced the first self erecting crane to the Irish market, the Ma-sol 18 06 had a maximum lifting capacity of 1,500 kg. Fast forward to 2024 and the self erectors in the Mantis Cranes range now lift loads up to 6 T, with tower cranes lifting up to 24 T. Advancements in crane capabilities in response to changing customer requirements have resulted in a very different landscape for the crane hire industry.

  • 2.5 min read

    Adhering to deadlines is crucial on construction sites and crane downtime can lead to a myriad of problems for contractors. Cutting crane downtime is the key to achieving deadlines. Deadlines range from permit & regulatory deadlines, material delivery deadlines, subcontractor deadlines, and budgetary deadlines to the final project completion deadline. Minimising crane downtime is pivotal to the overall success of a construction project.

  • 2.4 min read

    When restoring historic buildings, care must be taken to preserve these buildings for future generations. Cranes play a crucial role in this process and provide the necessary means of material handling, access, precision, and safety required to carry out restorations without causing additional damage. Over the years, Mantis Cranes have been involved in a number of iconic projects in some recognisable places that involved considerable planning not just to put the crane in place but also for the daily management of materials handling.