Mantis Cranes is pleased to announce the addition of the Potain HUP 40-30 Self Erecting Tower Crane to its hire fleet, the largest and most diverse fleet of Self Erecting Tower Cranes in the United Kingdom.

Potain HUP 40-30 being erected

In September we took delivery of two HUP 40-30s, the first of many that will be added to our Pedestrian Operated Tower Crane fleet. Following a period of training for our Crane Service Team the first of these will be on site during November.

The Potain HUP 40-30 has a 4,000kg capacity and a 40m jib length. Its maximum hook height is 30m, significantly more than other cranes of this size. The crane is operated using a wireless remote control. Click here to find out more about the Potain HUP 40-30.

The hoist unit features Potain’s High Performance Lifting (HPL) technology as well as High Performance Slewing (HPS) and an integrated diagnostic tool. The Power Control function allows the crane to operate with a range of power inputs.

Potain HUP 40-30 Features

  • 40m jib length
  • 4,000kg maximum capacity, 1,000kg at the jib end
  • 30m maximum tip hook height with jib horizontal
  • Remote control operated, giving the operator freedom to locate at hook point or point of delivery
  • High Performance Lifting (HPL)
  • High Performance Slewing (HPS)

Andy Stewart, National Sales Manager of Mantis Cranes Ltd said: “With the addition of the Potain HUP 40-30 to our Tower Crane Hire Fleet, our clients can avail of the greater flexibility and adaptability that this model has to offer. The new designs and technology available with the Potain HUP 40-30 allow it work and cover a greater variety of jobs.”

Potain HUP 40-30 Gallery

Share This Article, Choose Your Platform!

continue reading

Related Posts

  • 2.5 min read

    A site survey is completed before the crane is installed and it will ensure that the site is suitable for the safe installation and operation of a crane. A Mantis Cranes Representative will evaluate the site to identify potential hazards, logistical issues and safety requirements before the crane arrives on site.

  • 3.9 min read

    In 1999 when Mantis Cranes introduced the first self erecting crane to the Irish market, the Ma-sol 18 06 had a maximum lifting capacity of 1,500 kg. Fast forward to 2024 and the self erectors in the Mantis Cranes range now lift loads up to 6 T, with tower cranes lifting up to 24 T. Advancements in crane capabilities in response to changing customer requirements have resulted in a very different landscape for the crane hire industry.

  • 2.5 min read

    Adhering to deadlines is crucial on construction sites and crane downtime can lead to a myriad of problems for contractors. Cutting crane downtime is the key to achieving deadlines. Deadlines range from permit & regulatory deadlines, material delivery deadlines, subcontractor deadlines, and budgetary deadlines to the final project completion deadline. Minimising crane downtime is pivotal to the overall success of a construction project.