City Tower Crane Hire on an Office Project

Mantis Cranes recently provided a City Tower Crane Hire on an Office Project in Dublin.

We installed an FM Gru 10-35 Pedestrian Operated Tower Crane as it was the crane which best suited the restricted space available to erect. Additionally it was ideal for the point loadings that could be imposed upon the pedestrian pathway. Once on site the crane provides a 1 tonne lift at 35m (2.5t at 16m).

Having been erected over a weekend, the City Tower Crane will be working on the project on site for a hire period of up to 36 weeks.

City Tower Crane Hire on an Office Project

City Tower Crane Hire on an Office Project Details

The development involves adding extra floor space on the fourth level and an additional fifth level (sixth storey) to the existing structure on Harcourt Street; close the Dublin’s City Centre. The project includes relocating the existing plant, along with a new plant, on the roof level of the, soon to be, six storey building.

The new development will increase the overall floor space in the office block by almost 500 square meters.

Advantages of Using a City Tower Crane on this project

  • The crane occupies a smaller footprint, making it easier to fit on a site like this with restricted access
  • A Tower Crane provides excellent reach and lifting capacity
  • Allows the Crane Operator to deliver material right to the point of work with good accuracy

Benefits of Using Mantis Cranes

  • Mantis Cranes provide a consultation to help you consider your material handling options for any situation. We strive to provide you with the correct crane for your project at all times
  • Mantis Cranes advise on the appropriate accessories to use for your project

If you have a similar project coming up please do not hesitate to contact us today at 01388 748962.

Share This Article, Choose Your Platform!

continue reading

Related Posts

  • 2.5 min read

    A site survey is completed before the crane is installed and it will ensure that the site is suitable for the safe installation and operation of a crane. A Mantis Cranes Representative will evaluate the site to identify potential hazards, logistical issues and safety requirements before the crane arrives on site.

  • 3.9 min read

    In 1999 when Mantis Cranes introduced the first self erecting crane to the Irish market, the Ma-sol 18 06 had a maximum lifting capacity of 1,500 kg. Fast forward to 2024 and the self erectors in the Mantis Cranes range now lift loads up to 6 T, with tower cranes lifting up to 24 T. Advancements in crane capabilities in response to changing customer requirements have resulted in a very different landscape for the crane hire industry.

  • 2.5 min read

    Adhering to deadlines is crucial on construction sites and crane downtime can lead to a myriad of problems for contractors. Cutting crane downtime is the key to achieving deadlines. Deadlines range from permit & regulatory deadlines, material delivery deadlines, subcontractor deadlines, and budgetary deadlines to the final project completion deadline. Minimising crane downtime is pivotal to the overall success of a construction project.