Enterprise Centre

Morgan Sindall Plc was commissioned to build The Enterprise Centre, the United Kingdom’s greenest commercial building, for the University of East Anglia and the Adapt Low Carbon Group.

morgan sindall

Cygnum Timber Frame Ltd was subcontracted to construct the structure frame, a proportion which was sourced locally from Thetford Forest.

This Enterprise Centre project is the first of its kind in Britain and it has been constructed using the lowest possible embodied carbon. The means the amount of energy being used to build the project is kept to an absolute minimum. Walls that are made of thatch and wooden bicycle racks made from decking, highlights the sourcing of natural, renewable and local materials.

The Enterprise Centre and Mantis Cranes

Mantis Cranes Ltd supplied an IGO 50 Self Erecting Tower Crane, powered by a low emissions generator. it was commented by on site personnel that the IGO 50 was “absolutely the right tool for the job”. The IGO 50 contributed to achieving the core objectives of the project, while providing an effective materials handling solution. Mantis Cranes Ltd are delighted to be involved in such a unique and innovative project.

This project underlines the additional benefits of Pedestrian Operated Tower Cranes. The Self Erecting Tower Crane is extremely low in terms of carbon emissions in comparison to other material handling solutions such as mobile cranes or telehandler.

By using radio remote control the operator was able to be at point of delivery at all times and thus eliminating the need for an additional banksman. This improved efficiency led to reduced embodied carbon when factors such as reduced number of people traveling to site and onsite wastage are factored into account.

 

 

Share This Article, Choose Your Platform!

continue reading

Related Posts

  • 2.5 min read

    Adhering to deadlines is crucial on construction sites and crane downtime can lead to a myriad of problems for contractors. Cutting crane downtime is the key to achieving deadlines. Deadlines range from permit & regulatory deadlines, material delivery deadlines, subcontractor deadlines, and budgetary deadlines to the final project completion deadline. Minimising crane downtime is pivotal to the overall success of a construction project.

  • 2.4 min read

    When restoring historic buildings, care must be taken to preserve these buildings for future generations. Cranes play a crucial role in this process and provide the necessary means of material handling, access, precision, and safety required to carry out restorations without causing additional damage. Over the years, Mantis Cranes have been involved in a number of iconic projects in some recognisable places that involved considerable planning not just to put the crane in place but also for the daily management of materials handling.

  • 2.8 min read

    Since 1999 Mantis Cranes has been hiring and selling self erecting cranes, tower cranes and luffing cranes from our base in Co. Donegal. Over that time the company has grown to become an established name in our primary markets of UK and Ireland, offering a nationwide service in both countries.