When the Pedestrian Operated Tower Crane is erected on site, the service engineer calibrates the lifting capacities of the equipment.

These are not accessible by the crane operator at any stage thereafter.

Unlike other lifting equipment, once the equipment reaches its maximum the overload limit switches are activated and the crane hoist and trolley movements are automatically restricted with no override option available to the operator.