Our Saez TL55 working away on site, The Saez TL 55 City Tower Crane was configured with a jib length of 40m and a tower height of 40m.  Its maximum lifting capacity is 5,000kg at 20.2m and 2,250kg at the end of the jib.  The Tower Crane was fixed to a 1.7m Fixing Angle Base.  

Our client is running the project themselves which will see the development of the 310 Bedroom build for the First Motel One in Ireland, Middle Abbey Street, Dublin. Time-lapse  video from Glenbeigh Construction Limited

Check out our crane hire services, ask about our skills, capabilities, maintenance, and performance with an excellent safety record while also been compliant with ISO 9001, BS OHSAS 18001, ISO 14001.

For more information on crane hire generally or a quote on any of our fleet don’t hesitate to get in touch with us by info@mantiscranes.ie | Call: +353 (0)74 91 49981

Share This Article, Choose Your Platform!

continue reading

Related Posts

  • 2.5 min read

    A site survey is completed before the crane is installed and it will ensure that the site is suitable for the safe installation and operation of a crane. A Mantis Cranes Representative will evaluate the site to identify potential hazards, logistical issues and safety requirements before the crane arrives on site.

  • 3.9 min read

    In 1999 when Mantis Cranes introduced the first self erecting crane to the Irish market, the Ma-sol 18 06 had a maximum lifting capacity of 1,500 kg. Fast forward to 2024 and the self erectors in the Mantis Cranes range now lift loads up to 6 T, with tower cranes lifting up to 24 T. Advancements in crane capabilities in response to changing customer requirements have resulted in a very different landscape for the crane hire industry.

  • 2.5 min read

    Adhering to deadlines is crucial on construction sites and crane downtime can lead to a myriad of problems for contractors. Cutting crane downtime is the key to achieving deadlines. Deadlines range from permit & regulatory deadlines, material delivery deadlines, subcontractor deadlines, and budgetary deadlines to the final project completion deadline. Minimising crane downtime is pivotal to the overall success of a construction project.